The rough plumbing is all finished, just waiting on a deeper trench for the septic system back by our master bedroom that has some caliche-- they need to dig deeper, and waiting for the gravel that goes around all of the pipes down in the trenches. (This process is called "boxing in the pipe" with gravel.) This is coming along!! Just some electrical that needs to go in and then they can pour the slab for our foundation soon!! Yay!!!!
Subscribe to:
Post Comments
(
Atom
)
0 comments:
Post a Comment