Making Headway @ the House...
4.27.2023

Lighting fixtures (even though we don't have all of it) and ceiling fans are going in, plumbing fixtures @ sinks and showers are going in, tilers grouted the laundry room backsplash, hardware was installed on the master closet built-in chest of drawers and Justin finished the cabinetry work today (for now--he has to come back to install a cabinet door in the kitchen that had a chip. Unfortunately it didn't come with this last order even though the factory noted the chip on the door and had supposedly ordered another one...ugh!) I feel like these contractors are lacking in brain cells! They're the ones that noted it with an orange sticker at the factory before Justin even saw the chip! (Insert eye roll!) HVAC and air conditioning units are all installed and finished-- I believe... We had to exchange an undermount sink for an overmount :( in the basement kitchen because you can't do undermount with butcher block. It is what it is and IDK WHO missed that one! I've been telling them allllll along that this was butcher block here!! Oh and they installed the wrong faucet at the main kitchen sink. That one is supposed to go downstairs in the basement kitchen. Look at the spec sheet guys!!!!!!! It feels like lots of progress is being made, but that there are a lot of mistakes to fix the more progress that we make... so that ends up feeling like not a whole lot of progress is being made!! Make sense??? Still hoping the rest of our lighting comes in SOON! I'm trying not to hold my breath, but I am!! Overall, everything that is going in looks so good and I'm happy with the look of what I picked out! I'm so glad for that!!

leave a reply
Subscribe to:
Post Comments
(
Atom
)
0 comments:
Post a Comment