Moisture Barrier Almost Complete and Other Things...
11.03.2022

We have almost all the Tyvek moisture barrier up and things are going crazy inside with electrical!! No change with the exterior board and batten... The 2nd to last picture is all the electrical wires they're putting in-- this happens to be in McKenzie's room. The box for the sprinkler system is also located on the outside of McKenzie's room. (Last picture.) The sprinkler system inside the house is completely finished and ready to go! All the subs are busy getting ready for the inspection on Monday. (Nov. 7th) There are like 6 inspections, so it's a BIG one. Terry said that most likely with the way our inspector has been (Eric--he needs lots of prayers!) and with as much that is going on in this particular inspection, that most likely we won't pass. He said it will probably take another week to make all the changes that he will probably want. I'm really hoping this isn't the case! I hope that Eric is in a good mood on Monday. I asked Terry if I could bring him (Eric) cookies and he just laughed!! City of Peoria is CRAZY!!!

leave a reply
Subscribe to:
Post Comments
(
Atom
)
0 comments:
Post a Comment